Case(3)Ash Handling System for STANARI 1*300MW CFB Project,Bosnia and Herzegovina

  • Time of issue:2020-04-20

(Summary description)Location:
Near the Stanari lignite mine, Bosnia and Herzegovina.
Features:
Project: STANARI 1×300MW CFB Power Plant, Bosnia and Herzegovina.
EPC Contractor: Dongfang Electric Fuel: lignitePO Effective March,2012
Date: Rotary Ash Coolers, Bucket Conveyor, Bucket Elevator, Bottom Ash Silo, Fly Ash Silo, Bottom Scope of Supply Powder Silo, Bed Material Silo Delivery Date: April,2014

Case(3)Ash Handling System for STANARI 1*300MW CFB Project,Bosnia and Herzegovina

(Summary description)Location:
Near the Stanari lignite mine, Bosnia and Herzegovina.
Features:
Project: STANARI 1×300MW CFB Power Plant, Bosnia and Herzegovina.
EPC Contractor: Dongfang Electric Fuel: lignitePO Effective March,2012
Date: Rotary Ash Coolers, Bucket Conveyor, Bucket Elevator, Bottom Ash Silo, Fly Ash Silo, Bottom Scope of Supply Powder Silo, Bed Material Silo Delivery Date: April,2014

  • Time of issue:2020-04-20
Location: 
Near the Stanari lignite mine, Bosnia and Herzegovina.
Features: 
Project: STANARI 1×300MW CFB Power Plant, Bosnia and Herzegovina.
EPC Contractor: Dongfang Electric Fuel: lignitePO Effective March,2012
Date: Rotary Ash Coolers, Bucket Conveyor, Bucket Elevator, Bottom Ash Silo, Fly Ash Silo, Bottom Scope of Supply Powder Silo, Bed Material Silo Delivery Date: April,2014
Design and Fabrication Code: 
-ASME, and in compliance with the following EC directives:
-Machine Directive 2006/42/EC
-Pressure Equipment Directive 97/23/EC
-Low Voltage Directive 2006/95/EC
-Electromagnetic Compatibility Directive 2004/108/EC