Case (1) 2x235 MW Attarat Oil Shale Power Plant, Jordan (SHI FW Boiler)

  • Time of issue:2020-04-15

(Summary description)Owner: Attarat Power Company
Owner Engineer:Mott Macdonald ,UK
EPC Contractor: Guangdong Power Engineering Co., Ltd.
Technical Advisor of EPC Contractor: Worley Parsons, China

Case (1) 2x235 MW Attarat Oil Shale Power Plant, Jordan (SHI FW Boiler)

(Summary description)Owner: Attarat Power Company
Owner Engineer:Mott Macdonald ,UK
EPC Contractor: Guangdong Power Engineering Co., Ltd.
Technical Advisor of EPC Contractor: Worley Parsons, China

  • Time of issue:2020-04-15
Project Details
Owner:   Attarat Power Company
Owner Engineer:Mott Macdonald ,UK
EPC Contractor:   Guangdong Power Engineering Co., Ltd.
Technical Advisor of EPC Contractor:   Worley Parsons, China
 
Unique Features
–  2 x 235 MW boiler supplied by SHI FW
–  40x 30 t/h ash coolers for bottom ash by Songling
–  8x 6 t/h ash coolers for horizontal pass by Songling
–  Boiler Bottom Ash flow(Worst case):501TPH/per Boiler
–  Cooling water: condensate water
–  Design pressure: 3.9Mpa