中文   |   English

Case(4):10×135MW,for Jindal Steel & Power (SBW boiler),India

  • Time of issue:2020-04-20

(Summary description)Location
Harghoda,District Raigarh,India
Features
·10×135MW boilers supplied by SBW.
·4×25t/h Ling rotating ash coolers for each boiler in 01/2009.
· Ash system including ash cooler, bucket conveyor and ash silo.
· Cooling water. DM water.
· Design pressure:1.2Mpa.
· Ash outiet temperature:<150℃.

Case(4):10×135MW,for Jindal Steel & Power (SBW boiler),India

(Summary description)Location
Harghoda,District Raigarh,India
Features
·10×135MW boilers supplied by SBW.
·4×25t/h Ling rotating ash coolers for each boiler in 01/2009.
· Ash system including ash cooler, bucket conveyor and ash silo.
· Cooling water. DM water.
· Design pressure:1.2Mpa.
· Ash outiet temperature:<150℃.

  • Time of issue:2020-04-20
Location 
Harghoda,District Raigarh,India
Features
·10×135MW boilers supplied by SBW.
·4×25t/h Ling rotating ash coolers for each boiler in 01/2009.
· Ash system including ash cooler, bucket conveyor and ash silo.
· Cooling water. DM water.
· Design pressure:1.2Mpa.
· Ash outiet temperature:<150℃.

© 2022 SONGLING All rights reserved

Powered by www.300.cn   鲁ICP备09076653号