Case(7):Suancigou Power Plant 2x300MW

  • Time of issue:2020-04-20

(Summary description)Location
Zhunger county,Neimongol
Features
·2×300MW Unit,2×1025t/h CFB boilers supplied by DBW.
· Complete line of ash handling system from cooler to silo unloading system supplied by SEEC.
· Descriptions: ash from boiler front wall,6 coolers for per boiler,1
ash conveying line working and 1 ash conveying line standby, and
1silo for per boiler, each line including 1 chain bucket conveyor and 1 bucket elevator. Silo furnished with 2 wet ash unloading systems.

Case(7):Suancigou Power Plant 2x300MW

(Summary description)Location
Zhunger county,Neimongol
Features
·2×300MW Unit,2×1025t/h CFB boilers supplied by DBW.
· Complete line of ash handling system from cooler to silo unloading system supplied by SEEC.
· Descriptions: ash from boiler front wall,6 coolers for per boiler,1
ash conveying line working and 1 ash conveying line standby, and
1silo for per boiler, each line including 1 chain bucket conveyor and 1 bucket elevator. Silo furnished with 2 wet ash unloading systems.

  • Time of issue:2020-04-20
Location 
Zhunger county,Neimongol
Features
·2×300MW Unit,2×1025t/h CFB boilers supplied by DBW.
· Complete line of ash handling system from cooler to silo unloading system supplied by SEEC.
· Descriptions: ash from boiler front wall,6 coolers for per boiler,1
ash conveying line working and 1 ash conveying line standby, and
1silo for per boiler, each line including 1 chain bucket conveyor and 1 bucket elevator. Silo furnished with 2 wet ash unloading systems.

© 2022 SONGLING All rights reserved

Powered by www.300.cn   鲁ICP备09076653号