Owner: Attarat Power Company Owner Engineer:Mott Macdonald ,UK EPC Contractor: Guangdong Power Engineering Co., Ltd. Technical Advisor of EPC Contractor: Worley Parsons, China
Location: In the district of Vaivara, the north east of Estonia near the border with Leningrad Oblast, Russia and the Baltic sea.
Location: Near the Stanari lignite mine, Bosnia and Herzegovina. Features: Project: STANARI 1×300MW CFB Power Plant, Bosnia and Herzegovina. EPC Contractor: Dongfang Electric Fuel: lignitePO Effective March,2012 Date: Rotary Ash Coolers, Bucket Conveyor, Bucket Elevator, Bottom Ash Silo, Fly Ash Silo, Bottom Scope of Supply Powder Silo, Bed Material Silo Delivery Date: April,2014
Location Harghoda,District Raigarh,India Features ·10×135MW boilers supplied by SBW. ·4×25t/h Ling rotating ash coolers for each boiler in 01/2009. · Ash system including ash cooler, bucket conveyor and ash silo. · Cooling water. DM water. · Design pressure:1.2Mpa. · Ash outiet temperature:<150℃.
Location Fugu county,Shanxi Features ·2×300MW CFB boilers supplied by HBW. · Complete line of ash handling system from cooler to silo supplied by SEEC. · Descriptions: ash from boiler sidewal,6 coolers for per boiler,3 ash conveying line and 1silo for per boiler, each line including 1 chain bucket conveyor and 1 bucket elevator.
Location Zhunger county,Neimongol Features ·2×300MW Unit,2×1025t/h CFB boilers supplied by DBW. · Complete line of ash handling system from cooler to silo unloading system supplied by SEEC. · Descriptions: ash from boiler front wall,6 coolers for per boiler,1 ash conveying line working and 1 ash conveying line standby, and 1silo for per boiler, each line including 1 chain bucket conveyor and 1 bucket elevator. Silo furnished with 2 wet ash unloading systems.